I-15 detour for Arizona-Utah border project to begin May 29

I-15 detour for Arizona-Utah border project to begin May 29

(Mark Weaver, KSL TV, File)


Save Story
Leer en español

Estimated read time: Less than a minute

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

LITTLEFIELD, Ariz. (AP) — A lengthy detour of wide-load traffic on Interstate 15 for bridge resurfacing in northwestern Arizona’s Virgin River Gorge will begin May 29 and last a year.

The Arizona Department of Transportation says vehicles and loads wider than 10 feet traveling between Las Vegas and Cedar City, Utah, would use a 224-mile detour in southeastern Nevada and southwestern Utah.

The detour route includes sections of U.S. 93, Nevada State Route 319 and Utah State Route 56 and is 67 miles longer than the I-15 route.

The $6.4 million bridge project also will affect normal-width traffic because of delays from narrowing a 3-mile stretch of I-15 to only one lane in each direction to provide work space on the bridges.

#fb_embed

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Related stories

Most recent Utah stories

Related topics

UtahU.S.Southern Utah
The Associated Press

    STAY IN THE KNOW

    Get informative articles and interesting stories delivered to your inbox weekly. Subscribe to the KSL.com Trending 5.
    By subscribing, you acknowledge and agree to KSL.com's Terms of Use and Privacy Policy.

    KSL Weather Forecast