TransCanada to run inspection device in Keystone pipeline


Save Story

Estimated read time: Less than a minute

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

AMHERST, S.D. (AP) — TransCanada Corp. says it will run an inspection device through its Keystone oil pipeline to make sure there aren't segments of pipe with similar characteristics to a section that ruptured in South Dakota.

A company spokesman said Wednesday that it would run the pipeline inspection gauge through its system within a 120-day period ordered by a federal pipeline safety agency.

The Pipeline and Hazardous Materials Safety Administration this week issued a corrective order on the estimated 210,000-gallon oil spill. The report says a weight installed on the pipeline nearly a decade ago may have damaged the pipeline and coating.

The order says TransCanada must also submit a proposal to analyze available data on other weight locations for similarities with the leak location.

The company disclosed the leak Nov. 16.

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Most recent Business stories

Related topics

The Associated Press

    STAY IN THE KNOW

    Get informative articles and interesting stories delivered to your inbox weekly. Subscribe to the KSL.com Trending 5.
    By subscribing, you acknowledge and agree to KSL.com's Terms of Use and Privacy Policy.
    Newsletter Signup

    KSL Weather Forecast

    KSL Weather Forecast
    Play button