Navajo Nation entity starts solar farm amid station closing


Save Story
Leer en español

Estimated read time: Less than a minute

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

KAYENTA, Ariz. (AP) — A Navajo Nation entity has taken its first step to generating electricity by starting a solar farm.

The Daily Times of Farmington, New Mexico, reports (https://goo.gl/kLBfCz) the Navajo Tribal Utility Authority recently started operating the 27.3-megawatt Kayenta Solar Project on 200 acres (.8 square kilometers) near Kayenta, Arizona.

Officials say it is the first large-scale solar energy facility on the reservation.

Solar farm project manager Glenn Steiger says the closing of the Navajo Generating Station is leaving a hole in power generation in the region. He says that hole ultimately will be filled with renewable energy.

Steiger says the solar panels are equipped to position flat when wind speeds increase more than 50 mph. He says two weather stations on site monitor wind speed, temperature and humidity.

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Most recent Business stories

Related topics

Business
The Associated Press
    KSL.com Beyond Business
    KSL.com Beyond Series

    KSL Weather Forecast

    KSL Weather Forecast
    Play button