Truckee River flood control project clears major hurdle


Save Story

Estimated read time: Less than a minute

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

RENO, Nev. (AP) — A major Truckee River flood control project in the Reno area has moved a giant step closer to reality.

The project, designed to protect residents and businesses from devastating floods, has been approved for construction by the U.S. Army Corps of Engineers.

Jay Aldean of the Truckee River Flood Management Authority praised U.S. Sen. Harry Reid, saying he played a major role in securing both the agency's approval and funding from Congress for the project.

Aldean says the authority will continue working with Reid to clear other hurdles currently blocking the project.

The $280 million project authorized by Congress calls for a network of levees, floodwalls and riverbank terraces, and replacement of downtown Reno bridges that act as bottlenecks for river debris during floods.

A 1997 Truckee flood caused over $1 billion in damages in the region.

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Most recent U.S. stories

Related topics

The Associated Press
    KSL.com Beyond Business
    KSL.com Beyond Series

    KSL Weather Forecast

    KSL Weather Forecast
    Play button