Estimated read time: Less than a minute
This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.
LEWISTON, Idaho (AP) — The U.S. Army Corps of Engineers has released its final plan and environmental impact statement for manage sediment accumulation in the lower Snake and Clearwater rivers in northern Idaho.
The plan calls for dredging the navigation channel of the lower Snake River at the confluence of the Clearwater River as early as between Dec. 15 and Feb. 28 this winter.
The Lewiston Tribune reports (http://bit.ly/1vSxGlA) that the agency has been working on the plan since 2005. The final plan is more than 3,900 pages and cost $16 million to prepare.
The plan also identifies a number of other tools the agency can use to manage sediment over the next 20 years.
A 30-day public comment period on the plan will begin next Friday.
___
Information from: Lewiston Tribune, http://www.lmtribune.com
Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.







