Fermi 2 plant to remain shut down for refueling, maintenance


Save Story

Estimated read time: Less than a minute

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

FRENCHTOWN TOWNSHIP, Mich. (AP) — DTE Energy Co. says the reactor at the Fermi 2 nuclear power plant in southeastern Michigan will remain shut down as refueling and maintenance work is moved up.

The manual shutdown took place Sept. 13 due to a problem with a system used to cool auxiliary equipment at the plant along Lake Erie in Monroe County's Frenchtown Township.

Vito Kaminskas, Fermi 2 site vice president, tells the Monroe News (http://bit.ly/1WkD6j6 ) that since the plant already was shut down it "enables us to more efficiently use the time and resources necessary to begin work we had already planned" to complete starting this month.

An outage for refueling and maintenance at the Detroit-based utility's plant takes place every 18 months. More than 1,500 supplemental workers are at Fermi 2 to support the work.

___

Information from: Monroe News, http://www.monroenews.com

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Most recent Business stories

Related topics

The Associated Press
    KSL.com Beyond Business
    KSL.com Beyond Series

    KSL Weather Forecast

    KSL Weather Forecast
    Play button