Construction to hinder college move-in day


Save Story

Estimated read time: Less than a minute

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

RENO, Nevada (AP) — Students arriving for the fall semester at the University of Nevada in Reno will have to navigate a slew of trucks working on a new building near the dormitories.

The Reno Gazette-Journal reports (http://on.rgj.com/1pAFF26 ) that parking space will be limited when a record 19,000 students arrive for classes that begin Aug. 25.

A parking lot that was used in the past for cars to park on move-in days for the dormitories is not available this year due to the construction.

The trucks are hauling dirt and other material for a $44 million building set to open in 2017.

___

Information from: Reno Gazette-Journal, http://www.rgj.com

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Most recent U.S. stories

Related topics

The Associated Press
    KSL.com Beyond Business
    KSL.com Beyond Series

    KSL Weather Forecast

    KSL Weather Forecast
    Play button