Estimated read time: Less than a minute
This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.
AMSTERDAM (AP) - Royal Dutch Shell PLC says it has completed building the hull of the world's largest floating facility, which has been constructed to process natural gas off the coast of western Australia.
Shell said Tuesday that the 488-meter (1,600 foot) hull of the structure, known as "Prelude," was floated out of the dry dock in Geoje, South Korea where it is being built.
Prelude is designed to take in the equivalent of 110,000 barrels of oil per day in natural gas and cool it into liquefied natural gas for transport and sale in Asia. It will float above gas fields.
Shell says it can remain in place through a category 5 cyclone.
Construction began last year, three years after the project was announced. Gas production is slated to begin in 2017.
(Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)