News / 

Correction: WTC-Arts Center story


Save Story
Leer en español

Estimated read time: 3-4 minutes

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

NEW YORK (AP) - In a story Jan. 31 about a planned arts center at the World Trade Center site, The Associated Press, relying on information from the Lower Manhattan Development Corp., erroneously reported the organization appropriated $99 million for below-ground construction and design. The money is for construction above ground only.

A corrected version of the story is below:

Planned arts center at World Trade site gets boost

Planned performing arts center at World Trade Center site gets money for staff, building plans

By ULA ILNYTZKY

Associated Press

NEW YORK (AP) _ A performing arts center planned for the World Trade Center site got a financial boost Thursday that improves the chances of the languishing project to begin construction in four years.

The Lower Manhattan Development Corp. approved $1 million to hire staff or consultants to conduct research to determine the cost of building the center, said Maggie Boepple, director of the center.

The approval means that construction could begin in 2017, with a projected opening in 2019, she said.

"This is a push-off for the project," Boepple said.

And it's a boost for a neighborhood reborn after the Sept. 11 terrorist attack.

"This is really important for the economic revitalization of Lower Manhattan," said Julie Menin, former chair of the neighborhood's Community Board 1 who helped businesses there recover.

"It will bring jobs to the community and help small businesses," said Menin, who serves on the arts center board. "We can look to cities like San Francisco and Miami that have invested in performing arts centers, and see what that does economically for a city."

The LMDC had withheld the money in September, citing concerns over the project's cost and fundraising ability.

Boepple and a board of directors named last year have raised $25 million for the project.

The LMDC, a city-state corporation created to coordinate long-term plans for the trade center site, appropriated a total of $155 million for the arts center: $10 million has been spent for early engineering and design; $44 million has been approved for work below ground; $99 million has been allocated for construction of the facility; and $1 million, approved Thursday, for hiring staff or consultants. The LMDC on Thursday also authorized $1.5 million to the city to assist with design and engineering.

The $25 million already raised and future private funds will be used for the design, engineering, construction and other purposes, Emil said.

The board has addressed the concern over cost by scaling back the square footage of the project, Boepple said.

"We've taken out things our theater consultants told us were not essential, like lots of offices," she said. "It's easier and cheaper to rent offices in the surrounding area. We also took out a floor that would have been a rental floor for parties."

She said the adjustments "bring the cost down to something that is realistic."

"I don't know what the final number will be but it will be money that we believe we can raise," said Boepple, adding that it will be below the initial estimate of $400 million to $500 million.

Architect Frank Gehry was retained in 2006 to develop a world-class facility that could host and produce a range of performing arts.

It will present theater, dance and music from around the globe and produce work from young artists, composers, choreographers and playwrights," Boepple said.

The Joyce Theater, which presents dance, is expected to become the anchor tenant of the center.

Gehry's preliminary design calls for a 1,000-seat theater, a secondary 200-seat theater, rehearsal spaces and cafe, among other features.

One of the obstacles to construction has been the temporary Port Authority Trans Hudson train station entrance that occupies the space of the future center.

The entrance was created to provide access to the transit center that was badly damaged and flooded during the terrorist attacks.

The above-ground construction will start as soon as the temporary entrance to the PATH train station at the site is relocated, Boepple said.

(Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)

Most recent News stories

ULA ILNYTZKY

    STAY IN THE KNOW

    Get informative articles and interesting stories delivered to your inbox weekly. Subscribe to the KSL.com Trending 5.
    By subscribing, you acknowledge and agree to KSL.com's Terms of Use and Privacy Policy.

    KSL Weather Forecast