Estimated read time: Less than a minute
This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.
PITTSBURGH (AP) — Allegheny General Hospital evacuated areas including patient clinics and outpatient surgery after a contractor caused a power outage by hitting power lines while digging.
Duquesne Light officials say about 1,500 customers briefly lost power when the incident occurred about 9 a.m. Monday.
The power was quickly restored and hospital spokesman Dan Laurent says the facility was expected to resume normal operations about 10 a.m.
Laurent says the hospital has a backup power system, but officials say the hospital lost enough power to warrant moving the patients anyway.
Duquesne Light says the contractor hit the power lines while digging between the McKees Rocks and West End Bridges on the west side of Pittsburgh.
Allegheny General is on the city's North Side, a few miles away.
Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.





