PG&E gets OK to resume power plant demo in Calif.


Save Story
Leer en español

Estimated read time: Less than a minute

This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

BAKERSFIELD, Calif. (AP) — State regulators have given Pacific Gas & Electric Co. the OK to complete demolition of a Central California power plant after an initial attempt left several people injured.

Shrapnel flew into a crowd of more than 1,000 spectators when the Bakersfield power plant was imploded using dynamite and charges in August. Five people were injured, including a man whose leg was severed.

The Bakersfield California reports (http://bit.ly/1iROfpk) that the California Public Utilities Commission and state Division of Occupational Safety and Health have given permission to resume the work.

The utility says no explosives will be used this time. Instead, large equipment will be brought in to tear down what remains of the structure. PG&E did not say when the work would resume.

The botched implosion resulted in fines against two companies that were subcontractors on the project.

___

Information from: The Bakersfield Californian, http://www.bakersfield.com

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Most recent Business stories

Related topics

Business
The Associated Press

    STAY IN THE KNOW

    Get informative articles and interesting stories delivered to your inbox weekly. Subscribe to the KSL.com Trending 5.
    By subscribing, you acknowledge and agree to KSL.com's Terms of Use and Privacy Policy.

    KSL Weather Forecast