Federal study planned on raising Boise River dam

By Keith Ridler, Associated Press | Updated - Aug 14th, 2019 @ 9:58am | Posted - Aug 14th, 2019 @ 9:17am



This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

BOISE, Idaho (AP) — Federal officials plan to create an environmental study that will look at raising one of three Boise River dams to capture more water for irrigation and flood control.

The U.S. Bureau of Reclamation is taking comments through Sept. 9 and holding three meetings involving the proposed project to raise Anderson Ranch Dam by 6 feet (2 meters).

That would increase storage by 29,000 acre-feet. An acre-foot is about 326,000 gallons (1.2 million liters).

The Bureau of Reclamation is holding the public meetings on Aug. 27 in Pine, Aug. 28 in Boise and Aug. 29 in Mountain Home.

A plan to raise Arrowrock Dam 70 feet fell apart in 2016 when it failed a U.S. Army Corps of Engineers feasibility study.

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Keith Ridler

    KSL Weather Forecast