BNSF to install 2nd track from north Idaho to Spokane Valley

BNSF to install 2nd track from north Idaho to Spokane Valley

(File photo)



This archived news story is available only for your personal, non-commercial use. Information in the story may be outdated or superseded by additional information. Reading or replaying the story in its archived form does not constitute a republication of the story.

SPOKANE, Wash. (AP) — Rising train traffic is prompting BNSF Railway to make plans to install a second track from Hauser, Idaho, to the Spokane Valley.

The project calls for a 4.4-mile second track to be installed parallel to an existing BNSF mainline track, which carries freight from Seattle to the Midwest. The project is to be finished by 2035.

The Spokesman-Review says the project includes modifications of crossings, realignment of existing tracks, changes to existing railroad structures and construction of a new bridge over the Spokane River.

The goal is to ensure double track capacity across the Idaho Panhandle to the Spokane Valley.

An estimated 58 trains use the BNSF rail line every day. It's expected by 2035, that number will increase to 114 trains daily.

___

Information from: The Spokesman-Review, http://www.spokesman.com

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

The Associated Press

    SIGN UP FOR THE KSL.COM NEWSLETTER

    Catch up on the top news and features from KSL.com, sent weekly.
    By subscribing, you acknowledge and agree to KSL.com's Terms of Use and Privacy Policy.

    KSL Weather Forecast