Feedback   Contact Us
KSL TV 
   
   
KSL Live! 
   
KSL Shows 
   
iWitness 
   
Mobile 
The Utah Highway Patrol has released the names of two people killed after being ejected from their vehicle in a rollover crash along Trappers Loop (state Route 167) late Wednesday.
story image

'Shift Your Spending' campaign urges shoppers to buy local

Keith McCord  |  posted 30 minutes ago
Shopping local is another big push this time of year, as Salt Lake County Mayor Ben McAdams has called on Utahns everywhere to "Shift Your Spending".
story image

Driver in critical condition after tanker explodes near Spanish Fork

Pat Reavy and Andrew Adams  |  posted 32 minutes ago
A tanker explosion and the ensuing fire shut down I-15 near the U.S. 6 off-ramp Friday in Utah County.
story image

Woman charged in South Jordan street racing crash

Pat Reavy  |  posted Nov 28th - 9:06pm
An 18-year-old woman who police say was drunk and street racing when her pickup crashed, causing serious injuries, was charged Friday.
story image

5 ways to make the most out of Cyber Monday

by Blendtec  |  BrandView  
Cyber Monday may be the new black (Friday), but scoring the real deals may require a little strategic planning.
story image

Temple Square lights up for holiday season

Pat Reavy  |  posted Nov 28th - 8:36pm
Thousands of people converged on downtown Salt Lake on Friday, some for the traditional Black Friday shopping and others for the lightings of Temple Square and the Gallivan Center.
story image

Victory Theater fire changed way SLC firefighters battle blazes

Sloan Schrage  |  posted Nov 28th - 7:52pm
Eyesore, decrepit and urban blight are all words used to describe a century-old building that sits at 48 E. Broadway in Salt Lake City.
story image

New details into BYU soap or meth operation revealed in warrant

Pat Reavy  |  posted Nov 28th - 7:13pm
Drain cleaner and pseudoephedrine were some of the items collected by investigators looking into whether a BYU student was making soap or methamphetamine.
story image

Trooper jumps out of way as patrol vehicle hit by inattentive driver

Pat Reavy  |  posted Nov 28th - 7:01pm
A Utah Highway Patrol trooper's vehicle was struck on I-15 in St. George Friday.
story image

Family helps gather Christmas cards for dying Utah girl

Sam Penrod  |  posted Nov 28th - 6:36pm
In the quiet town of Fountain Green, the local post office is the heart of the community. And getting the mail from Box 162 is something that little Addie Fausett literally lives for.
story image

Traffic stops for texting while driving increase

By Lindsay Whitehurst, Associated Press  |  posted Nov 28th - 6:35pm
The number of people stopped for texting while driving on Utah's highways has increased sharply since lawmakers expanded the law to ban dialing phones or checking email behind the wheel, according to new numbers from the Utah Highway Patrol.
story image

Black Friday Round-up: Thinner crowds, protests, prison crafts

By The Associated Press  |  posted Nov 28th - 5:43pm
Black Friday shoppers are starting to look like procrastinators. Here's what happened during one of the busiest shopping days of the year in Utah and around the world.
story image

Backcountry skier narrowly misses avalanche near Brighton

Tracie Snowder  |  posted Nov 28th - 5:29pm
A backcountry skier triggered an avalanche west of Brighton on Thursday and narrowly missed being swept down the steep slope. The danger of slides is considerable in the area.
story image

Utah ranks third in state credit quality

Lisa Riley Roche  |  posted Nov 28th - 4:30pm
Utah's third-place finish in a ranking of state credit quality by a top financial publication underscores the state's reputation as a "boring but solid" investment, state Treasurer Richard Ellis said.
story image

10th annual Community Coat Exchange helps Utahns stay warm

Emilee Bench  |  posted Nov 28th - 4:02pm
Giving thanks continues the day after Thanksgiving as those in need of warm coats participated in the 10th annual Community Coat Exchange in Pioneer Park on Friday. The no-questions-asked exchange is open to anyone who needs a new coat.
story image

Immigrants' chances tied to their state's policies

By Bob Christie, Associated Press  |  posted Nov 28th - 1:46pm
If Christian Avila lived a few hundred miles to the west, he would have a driver's license and qualify for in-state college tuition and a host of other opportunities available to young people granted legal status by President Barack Obama two years ago.
story image

Proposed tax increase to fund teacher salary raises, schools

Morgan Jacobsen  |  posted Nov 28th - 12:21pm
A bill that would increase the personal income tax rate in Utah by 1 percent, collecting an added $585 million for education each year, has incited debate among lawmakers, educators and policy advocates.
story image

Ask a Chef: Making the most of Thanksgiving leftovers

by Harmons Ask a Chef  |  BrandView  
Chef Aaron Ballard from Harmons discusses...
story image

Proposed smog standard: 'Single costliest regulation in U.S. history'

Amy Joi O'Donoghue  |  posted Nov 28th - 9:36am
The EPA said it is considering lowering the ground level ozone standard to better protect people's health. But industry experts say the more stringent rule would be the most expensive regulation in history and will hike energy costs that would affect rural Utah.
story image

Student chefs team up with Salvation Army to serve families

Jed Boal  |  posted Nov 27th - 10:50pm
Several dozen young chefs from across the state put in a lot of time and care this week to prepare hot Thanksgiving dinners to deliver to families that might otherwise go without.
story image

Service dog killed in Murray house fire

Whitney Evans  |  posted Nov 27th - 10:47pm
A service dog was killed in a house fire that broke out Thursday evening in Murray.
Older Stories
Most Popular
Site Index
KSL's Children's Television Programming Reports, as well as its FCC public inspection file, are available for viewing during regular office hours at the KSL Broadcast House or online.
The station representative who can assist a person with disabilities with issues related to the content of the public files is Mike Dowdle, available during regular office hours at closed_captioning@ksl.com and (801) 575-5555.
© 2014 KSL.com | KSL Broadcasting Salt Lake City UT | Site hosted & managed by Deseret Digital Media - a Deseret Media Company  v03